Jinko Solar-Integratetd PV-Storage Solutions for Transportation | Airport

Jinko Energy

Integratetd PV-Storage Solutions for Transportation | Airport

This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Cookies Policy.

Accept
English

Integratetd PV-Storage Solutions
for Transportation

Airport
High-Speed Rail Stations
Gas Station Scenarios
Expressways

Scenario Description and Typical Load Characteristics

01. Scenario Description

Airports are classified as Class I critical power users, with high electricity demand and extremely stringent requirements for power supply reliability. Major loads include terminal lighting, air conditioning, and elevators; hangars; ground support equipment; runway navigation lights; and IT data centers. The load curve exhibits a bimodal pattern (morning peak from 8:00 to 10:00 and evening peak from 18:00 to 21:00) and is significantly influenced by flight schedules.

02. Typical Load Characteristics

Annual electricity consumption typically ranges from tens of millions to hundreds of millions of kWh, with significant load fluctuations and high peak power (approximately 5–10 MW for medium-sized airports and up to 20–50 MW for large airports). A base load persists overnight (airport overnight operations, security, check-in systems, etc.).

03. Policy Drivers

Civil aviation authorities and organizations in various countries—such as the Ministry of Ecology and Environment and the Civil Aviation Administration of China, which jointly issued the “Notice on Strengthening Environ-mental Impact Assessment Management to Promote the Green Development of Civil Transport Airports”—require that the concept of green development be integrated throughout the entire process of airport planning and construction. 

04. Industry Assessment Driven

Civil aviation authorities in various countries, such as the Civil Aviation Administration of China (CAAC), have issued the “Guidelines for the Evaluation of Smart Energy Systems at Civil Airports” (2024), which explicitly incorporates metrics such as renewable energy utilization rates, the proportion of new energy vehicles, and the utilization rate of APU replacement facilities into the evaluation system.

Scenario Challenges

High electricity costs:

  • Airports fall under the category of large-scale industrial electricity consumption. Base electricity rates are calculated based on demand, and there is a significant difference between peak and off-peak rates, resulting in electricity expenses accounting for a high proportion of total costs.

Extremely high requirements for power supply reliability

  • Any power outage could lead to flight delays or operational paralysis, necessitating the installation of emergency power sources; however, traditional diesel generators have high maintenance and operating costs and produce high carbon emissions.

Significant Pressure to Reduce Carbon Emissions

  • As urban gateways, airports must meet ESG requirements and reduce carbon emissions, yet their rooftop and parking lot resources remain underutilized.

Stringent Safety Standards

  • Terminal rooftops feature complex structures, and apron areas are subject to safety restrictions; installation locations must be carefully planned to address glare issues caused by photovoltaic modules.

Standardized Design Solutions for PV + BESS Capacity

PV Installation: It is recommended to utilize the rooftops of terminal buildings, parking lot canopies, and cargo terminal rooftops, with estimates based on available area.

For medium-sized airports

(annual passenger throughput of 10–20 million)

  • 15MW

    PV

  • 30MWh

    BESS

For large airports

(annual passenger throughput of 30 million or more)

  • 30MW

    PV

  • 60MWh

    BESS

International airports

(annual passenger throughput of 80 million or more)

  • 60MW

    PV

  • 120MWh

    BESS

Tiger Neo Anti-Glare Modules

  • Exceptional Anti-glare Performance

    The intensity of reflected glare is significantly lower than that of conventional modules across all incident angles, with a reduction of up to 80 per cent or more, meeting the requirement of a runway glare rating (GR) ≤ 50 as stipulated in China’s ‘Technical Requirements for Apron Floodlighting at Civil Airports’.

  • Reflection Suppression

    Reflectance is reduced by up to 85 per cent compared to conventional modules, whilst maintaining a glass transmittance equivalent to that of conventional modules.

  • High Power and High Power Generation

    Based on the proven Flying Tiger series, the front-side power output reaches up to 670W, with a conversion efficiency of 24.8 per cent and a bifaciality of 85±5 per cent, resulting in higher power generation per unit area.

  • Dual Authoritative Certifications

    Certified by TÜV Rheinland and the Swiss SPF, the anti-glare performance has been recognised by industry authorities.

SunTera G3 6.25MWh

Grid-forming and Black Start

  • Supports grid-forming operation, black start, and microgrid operation, suitable for weak grid and off-grid power supply scenarios.

High Safety and Reliability

  • A five-layer safety protection system and long-life design ensure the long-term stable operation of long-duration energy storage systems.

High Integration and Rapid Deployment

  • The system is highly integrated and factory-prefabri-cated, reducing on-site installation and commission-ing work and shortening the project construction cycle.

Smart O&M

  • Supports remote monitoring, condition diagnostics, and predictive maintenance to improve the opera-tional and maintenance efficiency of large-scale energy storage systems.

Charging and Discharging

Prioritize on-site consumption of solar power during the day

Solar power is prioritized to supply loads such as the terminal building and hangars, with surplus electricity stored in the energy storage system.

Emergency Backup Mode

In the event of a grid outage, the energy storage system automatically switches to off-grid mode to supply power to critical loads (control tower, check-in counters, security systems), ensuring operational safety

Peak shaving and valley filling with energy storage

During off-peak hours (00:00–08:00) the energy storage system charges

during peak hours (10:00–12:00, 17:00–19:00), it discharges to reduce demand-based electricity charges.

Revenue Generation

01
Electricity Cost Savings
02
Demand Management
03
Peak-Valley Arbitrage
04
Carbon Trading Revenue

Best Practice Case Studies

Athens International Airport—The World’s Largest Airport with Integrated Photovoltaic and Energy Storage

  • Athens, Greece
  • 123.8 MWh Jinko SunTera liquid-cooled energy storage system, comprising 36 containerized energy storage units

Taiyuan Wuxu Zero-Carbon Airport—China’s First Zero-Carbon Aviation Hub

  • Taiyuan, Shanxi Province, China
  • Total installed capacity of 108.5 MW, of which approximately 40 MW consists of Feihu anti-glare modules installed in the light-sensitive areas on either side of the runway
All Cases

Recommended Products

66 QL6-BDV

Bifacial Module

Learn More

SunGiga G2

Liquid Cooling ESS Solution

Learn More

SunGiga G2 Plus

Liquid Cooling ESS Solution

Learn More
↑
All rights reserved © 2026 Jinko Solar. 沪ICP备2022022315号-1. Privacy Policy. Powered by Webfoss.