Jinko Solar-Integratetd PV-Storage Solutions for Transportation | High-Speed Rail Stations and Train Stations

Jinko Energy

Integratetd PV-Storage Solutions for Transportation | High-Speed Rail Stations and Train Stations

This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Cookies Policy.

Accept
English

Integratetd PV-Storage Solutions
for Transportation

Airport
High-Speed Rail Stations
Gas Station Scenarios
Expressways

Scenario Description and Typical Load Characteristics

01. Scenario Description:

High-speed rail stations and train stations are large transportation hubs where loads are concen-trated in waiting halls, ticket offices, platform lighting, air conditioning, elevators, information displays, and security screening equipment. Load characteristics are strongly correlated with train schedules; loads are extremely high during peak passenger periods (such as the Spring Festival and other holidays), while they remain relatively stable during normal periods.

02. Typical Load Characteristics

Daytime loads are high (8:00–20:00), while nighttime loads are lower (approximately 30%–40% of daytime levels). For a medium-sized high-speed rail station (with a daily passenger throughput of 50,000–100,000), the peak load is approximately 3–5 MW.

03. Strong Policy Drives

Governments worldwide—such as China’s State Council, in its “Action Plan for Carbon Peaking by 2030”—have explicitly listed “building green transportation infrastructure” as a key priority. The Ministry of Housing and Urban-Rural Development requires that the rooftop PV coverage rate for new public institution buildings reach 50% by 2025.

Scenario Challenges

Underutilized Roof Space

  • High-speed rail stations typically have large station building rooftops, but structural load-bearing limitations (such as arched truss structures) make traditional PV installation difficult, and fall prevention and aesthetic considerations must also be addressed.

Complex electricity pricing structure

  • Some high-speed rail stations are connected to dedicated railway power lines, where electricity pricing policies differ from those for general industrial use, and there is limited scope for demand management.

High operational safety requirements

  • Photovoltaic modules must not compromise the structural safety of the station building and must prevent glare from interfering with train drivers’ vision.

High passenger traffic density

  • Mega-scale transportation hubs experience dense passenger flow, are subject to extremely strict fire safety regula-tions, and involve multi-disciplinary construction work.

Standardized Design Solutions for PV + BESS Capacity

PV Installation: Photovoltaic installations utilize station rooftops and canopies in station forecourts.

For medium-sized high-speed rail stations
  • 3MW

    PV

  • 6MWh

    BESS

For large hub stations
  • 12MW

    PV

  • 25MWh

    BESS

High-Efficiency Tiger Neo 3.0 Modules

In non-glare-sensitive environments such as high-speed rail stations and light rail systems, the Tiger Neo 3.0 ultra-high-power modules are used to maximize power generation

  • High power, high output:

    Based on the proven Tiger Neo modules, these modules feature a front-side power output of up to 670 W, a conversion efficiency of 24.8%, and a bifaciality of 85±5%, generating more electricity per square meter of roof space.

  • Excellent low-light performance

    Maintains a relative power output ratio of 96–98% under low irradiance of 200 W/m². Power generation gains can reach over 4% in low-irradiance scenarios such as cloudy or rainy days, as well as at dawn and dusk.

SunTera G3 6.25MWh

Grid-forming and Black Start

  • Supports grid-forming operation, black start, and microgrid operation, suitable for weak grid and off-grid power supply scenarios.

High Safety and Reliability

  • A five-layer safety protection system and long-life design ensure the long-term stable operation of long-duration energy storage systems.

High Integration and Rapid Deployment

  • The system is highly integrated and factory-prefabri-cated, reducing on-site installation and commission-ing work and shortening the project construction cycle.

Smart O&M

  • Supports remote monitoring, condition diagnostics, and predictive maintenance to improve the opera-tional and maintenance efficiency of large-scale energy storage systems.

Charging and Discharging

PV Self-Generation and Self-Consumption

PV-generated electricity is prioritized to supply basic loads such as station lighting, air conditioning, and elevators, with surplus electricity stored in the energy storage system.

Peak Shaving and Backup

Discharge occurs during the midday peak (11:00–14:00) and evening peak (17:00–19:00) to reduce demand.

Nighttime Charging

Charging takes place during off-peak hours (23:00–07:00) to take advantage of lower electricity rates; once the energy storage system is fully charged, it is held in reserve for discharge during the next day’s peak hours.

Seasonal Adjustments

During periods of extreme passenger traffic, such as the Spring Festival and National Day holidays, the energy storage system is fully charged in advance to support high loads around the clock.

Revenue Generation

01
Electricity Cost Savings
02
Demand Management
03
Peak-Valley Arbitrage
04
Carbon Trading Revenue

Best Practice Case Studies

Athens International Airport—The World’s Largest Airport with Integrated Photovoltaic and Energy Storage

  • Athens, Greece
  • 123.8 MWh Jinko SunTera liquid-cooled energy storage system, comprising 36 containerized energy storage units

Taiyuan Wuxu Zero-Carbon Airport—China’s First Zero-Carbon Aviation Hub

  • Taiyuan, Shanxi Province, China
  • Total installed capacity of 108.5 MW, of which approximately 40 MW consists of Feihu anti-glare modules installed in the light-sensitive areas on either side of the runway
All Cases

Recommended Products

66 QL6-BDV

Bifacial Module

Learn More

SunGiga G2

Liquid Cooling ESS Solution

Learn More

SunGiga G2 Plus

Liquid Cooling ESS Solution

Learn More
↑
All rights reserved © 2026 Jinko Solar. 沪ICP备2022022315号-1. Privacy Policy. Powered by Webfoss.