Jinko Solar-Integratetd PV-Storage Solutions for Transportation | Gas Station Scenarios

Jinko Energy

Integratetd PV-Storage Solutions for Transportation | Gas Station Scenarios

This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Cookies Policy.

Accept
English

Integratetd PV-Storage Solutions
for Transportation

Airport
High-Speed Rail Stations
Gas Station Scenarios
Expressways

Scenario Description and Typical Load Characteristics

01. Scenario Description

Gas stations (including charging stations and hydrogen refueling stations) are distributed commer-cial facilities. Their loads include fuel dispensers, lighting, convenience stores, car wash machines, and charging stations (if any). Load levels are high during the day (8:00–22:00) and extremely low at night, and are significantly affected by holidays and peak travel periods.

02. Typical Load Characteristics

The average peak load for a single gas station is approximately 50–100 kW; if equipped with fast-charging stations (e.g., four 120-kW fast-charging stations), the peak load can surge to over 500 kW, placing a signifi-cant strain on the power grid.

03. Policy Drivers

Governments worldwide—such as China’s Ministry of Transport and the National Development and Reform Commission (along with 11 other departments)—have jointly issued the “Implementation Plan for Promoting the Large-Scale Application of New Energy Heavy-Duty Trucks.” This mandates that charging and battery-swapping facilities, hydrogen refueling and swapping stations, integrated hydrogen production and refueling stations, green fuel refueling stations, and necessary clean energy development and energy storage facilities must be planned, designed, and constructed simultaneously with the main project.

Scenario Challenges

Pressure to Expand Charging Infrastructure

  • As electric vehicles become more widespread, gas stations are transitioning into “fuel + electricity” integrated energy stations. However, the capacity of existing transformers is limited, and expanding capacity is costly and time-consuming.

High Electricity Costs During Peak Hours

  • Charging stations operate during daytime peak hours when electricity rates are high, and may incur penalties for exceeding demand limits.

Limited Space

  • Gas stations have small footprints and limited roof (canopy) area. Additionally, they require explo-sion-proof and lightning protection measures, imposing special requirements on photovoltaic modules (corrosion resistance, spark-free).

Explosion-Proof and Fire Safety

  • Gas stations are classified as flammable and explosive environments, subject to nearly stringent safety require-ments.

Standardized Design Solutions for PV + BESS Capacity

PV Capacity: Utilize canopy roofs and convenience store rooftops.

Gas station environments impose far stricter requirements on the safety, fire resistance rating, and reliability of PV modules than conventional distributed projects. “Safety Guardian” Modules

  • 100kW

    PV

  • 400kWh

    BESS

“Safety Guardian” Modules

  • Ultimate Safety

    Certified to the rigorous dual IEC and UL Class A fire safety standards, these modules incorporate five core technologies—Class A system fire protection, UL 94 V-0 flame-retardant materials, dual certification for needle flame and glowing wire tests, anti-arc design, and robust mechanical load capacity—to truly fulfill the safety commitment of “no ignition, no fire spread, anti-static protection, resistance to wind and snow, and protection against short circuits caused by moisture penetration.”

  • High Power Output and High Energy Generation

    Based on the proven Tiger Neo module, it delivers a front-side power output of up to 670W, a conversion efficiency of 24.8%, and a bifaciality of 85±5%, generating more electrici-ty per square meter of roof area.

  • High Mechanical Load Capacity

    Passed tests with a front-side load of 6,000 Pa and a back-side load of 4,000 Pa, with hail resistance up to 55 mm (2.2 times the certification standard of 25 mm), capable of withstanding extreme weather conditions such as heavy snow, hail, and typhoons.

Solutions for Gas Station Scenarios

Uncompromising Safety

  • Cell-Level Thermal Isolation
  • Electrical Armor Shielding
  • Multi-Modal Fire Suppression
  • Full-Stack Early Warning

Superior Efficiency & Maximized ROI

  • 90% AC RTE (Round-Trip Efficiency):
  • Precise Thermal Management (ΔT <2℃)< /li>
  • All-Weather Operation

Intelligent O&M

  • AI-Driven Arbitrage
  • Intuitive Visual Interface
  • Proactive O&M

Charging and Discharging

Prioritize PV + Energy Storage for Charging Stations

PV power is used directly to power charging stations; when insufficient, energy storage supplements it to avoid peak-hour electricity rates from the grid.

Energy Storage Charging and Discharging Strategies
Charging Periods

Charge from the grid during nighttime off-peak hours, or charge during the day when there is excess PV power.

Discharge Periods

Discharge during peak charging hours to replace electricity purchased from the grid.

Demand Management

If the gas station’s transformer capacity is limited, the energy storage system can discharge the moment a charging station starts up to prevent transformer overload and avoid demand-related penalties.

Off-Grid Mode

In the event of a grid failure, the energy storage system can power critical equipment—such as convenience stores, lighting, and fuel dispenser controls— to maintain basic operations.

Revenue Generation

01
Electricity Bill Arbitrage for Charging Stations
02
Self-Generation and Self-Consumption of Solar Power
03
Demand Management Revenue
04
Increased Charging Service Fees

Best Practice Case Studies

Athens International Airport—The World’s Largest Airport with Integrated Photovoltaic and Energy Storage

  • Athens, Greece
  • 123.8 MWh Jinko SunTera liquid-cooled energy storage system, comprising 36 containerized energy storage units

Taiyuan Wuxu Zero-Carbon Airport—China’s First Zero-Carbon Aviation Hub

  • Taiyuan, Shanxi Province, China
  • Total installed capacity of 108.5 MW, of which approximately 40 MW consists of Feihu anti-glare modules installed in the light-sensitive areas on either side of the runway
All Cases

Recommended Products

66 QL6-BDV

Bifacial Module

Learn More

SunGiga G2

Liquid Cooling ESS Solution

Learn More

SunGiga G2 Plus

Liquid Cooling ESS Solution

Learn More
↑
All rights reserved © 2026 Jinko Solar. 沪ICP备2022022315号-1. Privacy Policy. Powered by Webfoss.